_________ is the biggest problem you can face if you don’t identify the scope of your risk management project. Scope creep Noncompliance System failure Nonrepudiation

Respuesta :

Numenius
Numenius Numenius
  • 12-09-2019

Answer: Scope creep

Explanation:

 Scope creep in the project management basically refers to the uncontrolled development or growth in the project creep. It basically occur when the project scope are not appropriately defined.

It usually involve lack of change in the control system and increase the complexity of the project. It is also has poor requirement analysis.

So, that is why it is the biggest problem we usually face in the project management.

Answer Link

Otras preguntas

HELP PLEASE BRAINLISET AND POINTS Question 1 (Fill-In-The-Blank Worth 5 points) (07.01 LC) Which of the following values in the set below will make the equation
Sales for january are budgeted at 50,000 units, and the company expects sales to increase 4% each month. how many units will need to be purchased in february if
What is the slope of EC?
round 389,900 to the nearest 100,000
A circle has a radius of 5 ft, and an arc of length 7 ft is made by the intersection of the circle with a central angle. Which equation gives the measure of the
If f(x) = 7x – 3 and g(x) = x2 – 4x – 8, find (f + g)(x).
how do a healthy family relationship affect members of a community
9th out of 10 questions
Please help need to finish ASAP
A 76 ​-ton monolith is transported on a causeway that is 2500 feet long and has a slope of about 3.4 degrees. how much force parallel to the incline would be re