preeshapatel09 preeshapatel09
  • 15-05-2022
  • Mathematics
contestada

Roadstone Limited can resurface 7/8km of a road in a day. How many days will it take
to resurface a road of length 14 km?

Respuesta :

profarouk profarouk
  • 15-05-2022

Answer:

16 days

Step-by-step explanation:

Let x be the number of days that it will take.

7/8 km per 1 day

14 km    per x day

We have to solve the equation:

[tex]\frac{x}{1} =\frac{14}{\left( \frac{7}{8} \right) }[/tex]

[tex]\Longrightarrow x=14\times \frac{8}{7} =2\times 8=16[/tex]

Answer Link

Otras preguntas

What occurs in the brain during the pruning process?
What advancements did Constantine bring to Constantinople?
What season of south park started continuity?
What were the key factors behind google's early success?
Is it true that landscapes are the one type of photograph in which you should always use the traditional perspective
Research on relationships in which the men adhere to traditional expectations have found that women in these relationships are:
___ place limitations on congress when bit comes to the rights of citizens
Find the terminal point on the unit circle determined by 5pi/4 radians
A box is 20 cm long. Which of these is closest to the length of this box in feet? (1 inch = 2.54 cm) 0.66 foot 0.75 foot 1.66 feet 7.87 feet
Which model best summarizes the importance of solar energy for life on Earth? a. The electromagnetic spectrum b. The carbon cycle c. A food web d. A mitocho