taejinkook
taejinkook taejinkook
  • 13-10-2022
  • Mathematics
contestada

two workers, the second worker starting work 1.5 days later than the first, would complete the scheduled work in 7 days. if each of them worked alone, the first worker would take 3 more days to do the work than the second. in how many days would each worker have finished the job working alone?​

Respuesta :

Otras preguntas

The Sun’s energy reaches Earth as ____________ and _______________ energy a) light, thermal b)light, electric c)thermal, mechanical d)thermal, nuclear
Can someone help with this question? (3/3)
Evaluate the expression:6+3/2
In what way are high-level programming languages limited? (5 points) a They are less readable by humans because they are written in the computer's native machin
Needs help with this
Martin Luther argued that the ONLY thing a person needed to gain salvation was
Find the amount accumulated after investing a principal P for t years at an interest rate compounded k times per year. P = $3,500 r= 5% t = 10 k = 4 A = ?
1. The location of two hikers is marked on the topographic map to the right as points F and H. What is the elevation of the camper at point F? 2. Each hiker cli
list the metric symbols from largest to smallest
can somebody help? please.