The MRP process of determining requirements for lower level items based on the master production schedule is referred to as
a. lot sizing.
b. netting.
c. backward scheduling.
d. exploding.

Respuesta :

Otras preguntas

Explain why animals must eat food, but plants do not have to.
list two ways that American Indians and European colonists were allies
How do u write 6 tenths in simplest form
A park is in the shape of a rectangle 2 miles long and 1.5 miles wide. How much shorter if you walk diaganolly across the park rather than along two sides?
A park is in the shape of a rectangle 2 miles long and 1.5 miles wide. How much shorter if you walk diaganolly across the park rather than along two sides?
Okay Here Is The Question Its 3 Parts:How Far Is The Sun From Earth?There Are 3 Feet In A Yard. How Many Yards Is The Sun From The Earth? Explain How.There Are
a single molecule has at least how many atoms
Explain why animals must eat food, but plants do not have to.
how are continents and tectonic pates related
On a map what do black dots usually represent?