Lead time for cakes is 4 days with daily demand of 30 cakes and a safety stock of 4 days. Each container (kanban) holds 20 cakes. What is the correct number of kanbans?
A) 8
B) 20
C) 6
D) 12

Respuesta :

Otras preguntas

The ideas of the new deal were based on
Evaluate the expression 6nm + 7m − 8n for m = 4 and n = 8. HELP ASAP!!
who was the supreme allied commader in charge of D-Day
A black mamba snake has a length of 3.12 m and a top speed of 3.24 m/s . Suppose a mongoose and a black mamba find themselves nose to nose. In an effort to esca
Clearly establishing property rights for water ownership would result in which of the following? Choose one or more: A. incentive to maintain the property B. in
Companies With Headquarters in Atlanta Coca-Cola Delta Airlines Georgia Pacific Home Depot What conclusion can be drawn from this list? A) Georgia's sea ports
In which of these samples do the molecules mist likely have the least kinetic energy
Which following groups is a population? A. All of the living things that interact within a forest ecosystem B. All of the living things and nonliving things th
which value is NOT a solution of 8x3 - 1 = 0?
What is 1/3+3/6+-3/10