If the optimistic estimate for an activity is 12 days, and the pessimistic is 18 days, what is the PERT standard deviation of this activity?
a) 1
b) 1.5
c) 3
d) 6

Respuesta :

Otras preguntas

What characteristic makes Biology a science, but not Art History?Using a process of testing ideas and gathering evidenceo Writing books about the subjectO Havin
What happened to charlie when he went in the boat
I will mark u brainleiest if u help me and 5 stars
What does weight training use? flexibilty of muscle control
A bike wheel. A bike wheel is 26 inches in diameter. What is the bike wheel's diameter in millimeters (1 inch = 25.4 millimeters)?
W is the work done on the system, and K, U, and Eth are the kinetic, potential, and thermal energies of the system, respectively. Any energy not mentioned in th
ANSWER QUICKLY PLZZZZZZ ANSWER QUESTION B​
Quadrilateral ABCD is similiar to quadrilateral EFGH. The lengths of the three longest sides in quadrilateral ABCD are 60 feet, 40 feet, and 30 feet long. If th
7 students in a class,3/4 th pound of a cake .divide cake each student?
ਡwhat is oral history? ​