A scrum master on another team asks you for advice about how to handle a user who keeps changing his mind about what the team should build. You should:
a) Ignore the user's requests
b) Politely ask the user to stop changing their mind
c) Incorporate flexibility into the project management approach
d) Report the user to higher management

Respuesta :

Otras preguntas

How did they torture Mr.Corey to try to get him to talk?
What is the current GDP? (Gross Domestic Product)
Bishaar's height is measured at 4.75 feet tall. Express Bishaar's height in meters. Round your answer to the nearest hundredth meter.
What is the final goal of Hinduism?
(36) (37) Please help I hardly remember how to do these it has been so long
Isabel wanted to drink 39 bottles of water each day, so she bought 356 bottles on sale. How many more bottles will she need to buy on the last day?
The Vice President who resigned to lead the fight against the 1832 tariff
(4m+3)9+6m how do i solve it?
Which of these disorders occurs when there is a loss of blood flow, and in turn oxygen, to the brain?
Zoe has been doing research on her topic for a while and finally came across an online resource that looks promising. The only problem is that she can't figure