carl105
carl105 carl105
  • 04-04-2016
  • Mathematics
contestada

what is In 7 days, a group of workers can plant 21 acres. What is their rate in acres per day?

Respuesta :

kelpel197
kelpel197 kelpel197
  • 04-04-2016
So do 21/7 to give you how much they do in a day. The answer is three so they do 3 aceres in a day.
Answer Link

Otras preguntas

For f(x) = 4x^4 - 2x^3 + x^2 + 3x - 15, find f(5) using synthetic substitution.
The Hubble Space Telescope orbits the Earth at approximately 612,000m altitude. Its mass is 11,100 kg and the mass of earth is 5.97e24kg. The Earth’s average
The first wave of the women's movement had a radical branch and a conservative branch. the conservative branch concentrated on ________.
The number of waves past a point in a certain amount of time is defined as which quantity of the wave ? A) amplitude B) wavelength C) frequency D) period
Please someone help me with B), C) and D)!!!
Two more than the quotient of a number and 6 is equal to 8
True or false support for Britain was very low in Canada
Which of the following situations would cause the greatest decrease in the motion of molecules in a system? A. Q = -50 J, W = -50 J B. Q = +50 J, W = +50 J C.
En la oración: "Siento la caricia salada de las olas en la playa ".Las palabras: "caricia salada" son: *
In political terms, why did president kennedy need to appear tough on communism