OdalquisRamirez
OdalquisRamirez OdalquisRamirez
  • 13-09-2019
  • Mathematics
contestada

On a construction project, poured concrete is given 1,000 hours to dry completely.
What is the result when this time is converted into days?
Use 24 hours = 1 day.
Enter your answer in the boxes.
days,
hours

Respuesta :

NathanCrews75
NathanCrews75 NathanCrews75
  • 13-09-2019

Answer:

41.6 days.

Step-by-step explanation:

1000 divided by 24 is 41.6 repeating

Answer Link

Otras preguntas

What is probability and it formula​
Reason why the recording of data at school weather station may be inaccurate
Use the paragraph from a speaker's argument to answer the questions.You have probably heard the saying that a dog is a man's best friend. But have you everstopp
EXPLAINING EFFECTS What is the result of a price that isset above the equilibrium price? Below the equilibriumprice?
trig. help i do not know this
simple present tense eat​
Geometry problem: how do I get the X from this?
22Write an essay in which youcontrast the way two poetsuse setting to develop a themesurrounding the reflection ofhumanity in nature.-Poems:"Stopping by Woods o
The following table represents the highest educational attainment of all adult residents in a certain town. If a resident who has only completed some college is
Help me solve please