4. Explain the purpose of a change control process. Who should be on the committee and often should it meet?

Respuesta :

Manetho
Manetho Manetho
  • 02-10-2019

Answer:

Explained

Explanation:

Change control process has a purpose to ensure that the changes are made within a project in a consisted manner and the appropriate stake holders are informed about the state of the product, changes to it and the cost and the schedule impact of these changes. The change control board in a software company often consists of the development manager, the test lead and the product manager( Subject matter expert).

Answer Link

Otras preguntas

Describe an example of a fossil that consists of an entire organism
I really need help on geometry
What are three most common types of land forms in Washington
Mendel realized that the principles of probability could be used to what the results of genetic crosses?
I need an example of Alliteration in A Tale of Two Cities asap please
Gabriella wants to tile a room with an area of 320 square feet. The width of the room is 4/5 its length. What are the length and width of the room?
Why do most organisms that die not leave a record of their existence
what is 35 5/7 multiplied by 3.14 or multiplied by 22/7
Mendel realized that the principles of probability could be used to (blank) the results of genetic crosses.
how many different (non-conguerent) triangles  have integer side lengths and perimeter 2014