To complete a job a crew of 8 people needs 18 days. How long will the same job be finished if the crew will have 9 people?

Respuesta :

rockyrules789 rockyrules789
  • 01-11-2019

Answer:

16

Step-by-step explanation:

.

Answer Link
lajfoaofje lajfoaofje
  • 27-06-2020

Answer:

16

Step-by-step explanation:

Answer Link

Otras preguntas

What is the product of the preparatory reaction
DUE IN 30MIN Pyramid The height of the pyramid is 481 feet. If the lateral side is 652 feet, what is the TOTAL length of the bottom of the pyramid face?
Give 3 examples for uses of the lithosphere.
2. Calculate the diameter and radius of a circle whose circumference is 26.4 m. 3. If the diameter of a circle is 5.6 m, what will be its radius and circumferen
if ratio x and y form a proportion and ratio y and z form a proportion, do ratio x and ratio x form a proportion?
negative 5 x squared plus 3 xy minus 6 y squared plus 4 x squared minus xy plus 2 y squared
Which of these quotes from Bret Harte's "The Outcasts of Poker Flat" is most characteristic of the Western genre? A. There was a remembrance of this in his bo
You have a 400ml beaker with 100ml of water you add 2 sugar cubes to the water the concentration of the solution (in sugar cubes/ unit volume of water is
What is one difference between a monologue and a soliloquy? Which one is the right answer? 1. A monologue happens between all characters, while a soliloquy is
what do you think are the rights as students