​Finishing the construction of a home two days after the contract called for completion (no injury occurs) most likely will be considered

Respuesta :

andriansp andriansp
  • 08-06-2016
Finishing the construction for a longer period than the date that already agreed upon would be most likely considered : Breach of Contracts.
Which mean that the constructor basically fail to met his end of the contract agreement, causing the other party has the right to walk out from their contract
Answer Link

Otras preguntas

What is 2 3/4 multiplied by 3?
Environmental wellness can best be described as Answer finding purpose in human existence. goal setting and finding meaning in your daily activates. knowledge a
A search warrant gives the police legal authority to search private property. the right to keep someone jailed until bail is met. authority to arrest someone. a
What is a judgement based on observation and experiments called?
Ms Hernandez has 17 tomato plants that she wants to plant in rows. She will put 2 plants some rows and 1 plant in the others. How many different ways can she pl
The Coriolis effect causes surface ocean currents to _____. flow in straight lines between the poles bend and curve around the planet move more quickly than dee
what is simple subject the saturn rocket made travel to the moon possible
For which of the following did President Theodore Roosevelt win the Nobel Prize in 1906? for building the Panama Canal for the Roosevelt Corollary for the Open
What is 2 3/4 multiplied by 3?
question number 1)8m 12cm=_cm