cricecrice6100 cricecrice6100
  • 12-02-2020
  • Social Studies
contestada

Task level and project level charts are both prepared by the same person, usually the project manager. True False

Respuesta :

bratislava bratislava
  • 16-02-2020

Answer:

True

Explanation:

  • The project manager is accountable for the activities that result n the end results also maintain the progress. And the mutual interaction of the tasks of various parties and reduces the risk of the failure and maximizes the benefits and reduces the costs.
Answer Link

Otras preguntas

1 Select the correct answers. Which two pieces of background information are important to know about your audience? whether the audience consists of more men or
Why is the isotope oxygen-18 (180) different from the isotope oxygen-16 (160)? O Its atomic mass is different because it has two more neutrons. O Its atomic mas
I need some math help please
Triangle XYZ has vertices X(0, 2), Y(4, 4), and Z(3, –1). Graph △XYZ and its image after a rotation of 180° about (2, –3).
What is the importance/role of each of these religious figures to the monotheistic faith they’re connected to? (note that some figures may be related to more th
Please help due soon!!!
I need help on this problem please
Whats the slope of (–2, –5) and (–7, –3)?
Which of the following is an example of how culture can help humans survive? O O A. The overuse of resources can make a human practice unsustainable. B. The dev
hi how can you fix this issue?​ click the picture btw