swtnru9440 swtnru9440
  • 04-03-2020
  • Mathematics
contestada

company 2 charges 4600$ for the first 550 feet of fence and 29 for each additional feet.find the cost if company 2 completes the job the total fence is 660​

Respuesta :

perry24366
perry24366 perry24366
  • 04-03-2020

Answer:

I love you 6.78

Step-by-step explanation:

You have to love yourself

- 5x

-6 x 45

6.78

Answer Link

Otras preguntas

What is 5/9 as a decimal
In which of the following sentences is the underlined word a present participle? A. Jessica enjoys running. B. Grandma had sent us cookies. C. They a
Sarah bought 8 folders and 3 rulers. Lea bought 8 rulers and 3 folders. Sarah paid $1.25 more than Lea. How much was each folder if each ruler was .45
how did radio change the American way of life
what is the value of 5 in 673,512
Witch contains genetic material of an eukaryotic cell? nucleus or large central vacuole?
how to solve for 9-2x=35
The Neolithic era differed from previous time periods because the people no longer ________. a. relied on others to fulfill specific roles in society b. depen
What is 0.26 written as a fraction in simplest form
Convert 0.3 to a fractions and a percent