seppy36
seppy36 seppy36
  • 13-05-2020
  • Mathematics
contestada

A construction company can remove 934 metric tons of dirt from a construction site in 412 hours.
What is the unit rate in metric tons per hour?

Write your answer as a fraction or a mixed number in simplest form.

Respuesta :

aksh2007
aksh2007 aksh2007
  • 14-05-2020

Answer:

2.27

Step-by-step explanation:

Answer Link

Otras preguntas

find the perimeter of the figure. each unit is 1 cm​
which inequality represents all values of x for which the product below is defined
Someone help me please! :) Thanks in advance!
The box shown is used to ship miniature dice with side lengths of 1/2 in. × 1/2 in. × 1/2 in. How many dice cubes can fit in the box?A) 480 dice B) 1920 dice C
this image shows rows of potato plants which elements of design does this image show? 1. the image shows both unity and variety 2. the image shows Unity only 3.
PLS HELP ME WITH THIS QUESTIONNN
how is the quote “injustice anywhere is a threat to justice everywhere” valid today?
Which system of inequalities is is represented by the graph
The final step that will prove the length of hypotenuse c, squared that of each leg
What happens to the value of the expression 5/x+5 as x decreases from a large positive number to a small positive number? 1.It increases 2.it decreases 3.it sta