melodie34 melodie34
  • 11-09-2020
  • Mathematics
contestada

You get a job with a construction company. They pay you $18.25 per hour. If
you work 36 hours in a week, what is your straight-time pay?

A. $635
B. $657
C. $659
D. $661
E. $664
F. $669

Respuesta :

sweekaracharya
sweekaracharya sweekaracharya
  • 11-09-2020

Answer:

answer is B $657

Step-by-step explanation:

I guess I was help full for u

plz follow me for more updates

Answer Link

Otras preguntas

I just need the equation on how to do it. I'm so lost :'( help please!!!!!!
wats the 60% off a prize that is $20.00
what does como eres tu mean in spanish?
If f(x) is 4x-3 what is (f^-1of) (10)
2-3 facts about Warsaw Pact
What are the characteristics of mass culture?
Compute the odds in favor of rolling a sum of 10 in a single roll of two fair dice
A graph depicts force versus position. What represents the work done by the force over the given displacement? A. The work done is equal to the product of the m
lara has a tin of peanuts cashews and pecans she will pick a second nut without looking. how many outcomes are there for her two picks?
Two diverging light rays, originating from the same point, have an angle of 5° between them. After the rays reflect from a plane mirror, what is the angle betwe