jewelstream2000
jewelstream2000 jewelstream2000
  • 13-12-2020
  • Engineering
contestada

Which design activity is part of the design for manufacturability (DFM) methodology?
Aavold parts that are mirror Images
B. establish guidelines on the go
с. some asymmetrical parts are acceptable
D.
maximize utilization of setup time

Respuesta :

breannahalsted breannahalsted
  • 13-12-2020

Answer:

D would be correct because it maximizes it.

Answer Link

Otras preguntas

Name 3 adjectives that describe one of your recent math test
What do limiting factors control
PLEASE HELP!! I really need it
Air at 110 kPa and 50°C flows upward through a 6- cm-diameter inclined duct at a rate of 45 L/s. The duct diameter is then reduced to 4 cm through a reducer. Th
Identify the slope of the line for the equation y = 10x + 3.
Katie's gross monthly salary is $3,800. 22% of her income is set aside for income taxes. Katie saves 8% of her salary. after taxes and savings, how much does Ka
x2 + 10x – 11 = (x - 1) x2 + 12x + 11
which level of organization includes all the other levels of organization ​
HELP ME OUT PLEASE !!! WILL NAME BRAINLIEST:D
Bobby drove 110 miles, and his car used up 5 gallons of gas. How many miles can he drive with 16 gallons of gas? Plz help me