When looking at a program board at the end of program increment (PI) planning, what does it mean when a feature is placed in a team's swim lane with no strings

Respuesta :

IfeanyiEze8899 IfeanyiEze8899
  • 04-01-2021

Answer:

It simply means that other teams can independently complete the feature.

Explanation:

PI or program increment is a planning interval during which an agile release train (ART) plans and produces working and tested software and systems. It takes a duration of 8 to 12 weeks

Agile teams can access and independently complete various ARTs found in their swim lanes with no strings.

Answer Link

Otras preguntas

What is a credit card balance
Ellie uses 27 feet of fabric to make 48 doll dresses. she uses the same amount of fabric to make each dress. How many yards of fabric did Ellie use to make each
Ellos compraron "el reloj pulsera" Which sentence correctly substitues the bolded phrase? A. Ellos lo compraron B.Ellos la compraron C.Ellos los compraron D.Ell
What kind of job would you have where you would want to stop blinking
the volume of the cube is 512in3 what is the side length
1 pair of opposite sides that are parallel
What was the state of the many, diverse, religions in India under British rule? A. They were, for the most part, united behind a goal for independence. B. There
The world’s oldest surviving novel was written by _____. A) Lady Madona B) Lady Murasaki C) Lady Meika D) Lady Maurya
A person’s phenotype can be best described as:
Shakespeare's 1 is classified as Middle 1 because it so closely resembles the 1 of the medieval period. a. True b. False