how do you find the mean completion time of a PERT network diagram?​

Respuesta :

okekesarah01642112
okekesarah01642112 okekesarah01642112
  • 02-01-2021

Answer:

PERT is an estimating technique that uses a weighted average of three numbers (see below) to come up with a final estimate. The resulting PERT estimate is calculated as (O + 4M + P)/6. This is called a "weighted average" since the most likely estimate is weighted four times as much as the other two values.

Answer Link

Otras preguntas

What is the value of –6 • 4 + (–7) • 3?
One way the modern atomic model differs from Thomson's atomic model is that electrons are no longer scattered throughout and atom's positive matter like chocola
Which of these means "long verse poem"? A.haikai b.zoku c.kigo d.chōka
Which statement is scientifically based? A).Mutations rarely occur. B).All mutations are harmful. C).Some mutations can be contagious, like infections. D).Mutat
who held the most power in the greek family
In the summer Brian saw 20 movies at the theater. in the fall he saw one fourth as many movies. Write an equation that shows how many movies he saw in the fall
what phase occurs between the full moon and the third quarter?
Which correctly describes the net of a square
What is the term that describes a group of firms cooperating with each other in order to avoid competition? competition collusion communication combination
diameter = 8 cm circumference =