A construction company delivered 40 loads of concrete in 5 days.

What was their rate of work?



A.




B.




C.




D.


Respuesta :

melhunt99
melhunt99 melhunt99
  • 05-11-2016
Well 40 divided by 5 is 8 and you don't have options so I would say 8 loads a day :)
Answer Link

Otras preguntas

Rhyme scheme describes the pattern created by _____. A. the meter in a poem B. the end rhymes in a poem C. the stanzas in a poem D. the symbols in a poem
What factors led to an American declaration of war? (Select All That Apply) assassination of Franz Ferdinand Zimmerman note Russian Revolution German U-boat
the rectangular prism with volume 120 cm3, width 5 cm, and height 3 cm. what is the length?
William Tweed’s legacy is best compared to which of the following? A. a famous inventor who developed a new tool for factories B. a philanthropist who worked to
Why is a goat such a valuable gift in district 12
Suppose a varies directly as b and a varied inversely as c. Find b when a=8 and c=-3, if b=16 when c=2 and a=4
If a gas has a volume of 1000 ML at a temperature of 23°C and a pressure of 100 mmhg, what is it’s volume under standard conditions of temperature and pressure?
Please help!! the picture is attached :) let me know if you can figure out any of these
Which of the following are tasks associated with business administration positions? Select all that apply. A. answering phones B. designing goods for product
What happened at Seneca Falls during the Women’s Suffrage Movement? Question 14 options: a) A gathering in Seneca Falls to help end injustice for Native Amer