ed55thefm5
ed55thefm5 ed55thefm5
  • 15-03-2021
  • Mathematics
contestada


b. Draw a line representing the relationship between x, the number of hours it takes
the painting company to finish the house, and y, the total cost of painting the
house. Label the two points from the earlier question on your graph.

Respuesta :

SlovenZambia
SlovenZambia SlovenZambia
  • 15-03-2021

Answer:

Where's the graph?

Step-by-step explanation:

^^^

Answer Link

Otras preguntas

use function notation to represent the area of a circle whose circumference is 103 cm
Which of these is a similarity in these two movements
Find the values of x and y.
I have 43 cubes how many tents and ones can I make
Friction: a) comes from microscopic bumps that act as obstructions to the object's motion. b) is the name given to the force acting between surfaces sliding p
!!PLEASE ANSWER ASAP!! electromagnetic radiation moves as electromagnetic waves; therefore, these waves can move through _______. a. both air and space b. only
What is the name of the two most famous attractions at Piñones?Isla de pascua y archipiélago Puerto Peñasco y playas negras Isla Verde y Condado Isla tortuga y
Which person would be most likely to identify as transgender
Fred: Hola Luis. ¿Cómo ____________________? no estás días luego
How does speciation occur ?