zamyrie66 zamyrie66
  • 14-06-2021
  • Mathematics
contestada

20 men take 10 days to complete a piece of work. find the time taken by 8 men to complete the same piece of work

Respuesta :

michaelpuen12 michaelpuen12
  • 14-06-2021
For the 8 men to finish the work it would take 16.76 days to finish the piece of work
Answer Link

Otras preguntas

Simplify four square root 2+7 square root 2-3 square root two
Calculate the IRR if the power company gets a fixed feed-in tariff of $0.25/kWh, for 20 years and the salvage value of the plant after 20 years is $20 M.
Which of these is most closely associated with system control? (1 point) (Points : 1.5) boundary environment feedback interface
Suppose that a constant force is applied to an object with a mass of 12kg, it’s creates an acceleration of 5m/s^2. The acceleration of another object produced b
Use the Ref An aqueous solution of chromium(II) acetate has a concentration of 0.260 molal. The percent by mass of chromium(II) acetate in the solution is Submi
A 20-lb force acts to the west while an 80-lb force acts 45° east of north. The magnitu 80 lb 70 lb 067 lb 100 lb
Can someone help me, I have no idea how to do this :(
Write a C++ program where Two or more strings are anagrams if they contain exactly the same letters, ignoring capitalization, punctuation, and spaces. For examp
If each side of a square patio is increased by 4 feet, the area of the patio would be 196 square feet. Solve the equation (s+4)2=196 for s to find the length of
If variable x has value 2 and y has value 1, which values could result from the following Jack expression? x + 3 * 4 - y