kamalrawat187
kamalrawat187 kamalrawat187
  • 01-07-2021
  • Mathematics
contestada

A canning factory turns out 568 tins of jam on a certain day. How many tins will be produced in 297 working days? ​

A canning factory turns out 568 tins of jam on a certain day How many tins will be produced in 297 working days class=

Respuesta :

madukasundi157
madukasundi157 madukasundi157
  • 01-07-2021

Answer:

[tex]568 \: \times \: 297 \: = \: 168696.[/tex]

188,696 tins be produced in 297 working days.

☆ Don't forget to thanks

☆ Mark as brainlist.

Answer Link

Otras preguntas

if fluorine 20 undergoes beta decay , what will it become ?
For the same food trailer mentioned in Example 1, explain how to find the experimental probability that the next order is two pieces of chicken with a green sal
Why are satellites placed into orbit at least 150 km above Earth’s surface?
A triangle has sides of length 12 miles, 9.6 miles, and 7.2 miles. What is the perimeter?
How do you say everything is going to be ok and i hope you survive the military in russian.
What is poetry based on?
In what way has integration helped in America?
It used to be considered a faux pas for women to wear pants.What is the origin of faux pas, and what is its meaning?A. origin DutchMeaning a social mistake or s
Which is the best description of the transformation shown? A. A pentagon is reflected across the x- axis. B. A pentagon is reflected across the y- a
The graphs represent Daniel's ride to the ballpark. Describe Daniel's speed as he gets closer to the park. Justify. A) constant; the slope of the line between p