lemogang63587 lemogang63587
  • 15-01-2022
  • Mathematics
contestada

It takes 6 workers 8 hours to tile a hall . How long will it take 4 workers to complete the same job

Respuesta :

icandoitjwk icandoitjwk
  • 15-01-2022
6w=8
2w=8/3

So
4w=8/3x2
4w=16/3
Answer Link

Otras preguntas

Which side had a more difficult time rebuilding after the civil war South or North?
~Novel:The Lightning Thief ~Chapter:19 ~With Evidence(Quote) -"What does the Scene in the throne tell you about each of the three friends:Annabeth,Grover,and Pe
What is 4 11/12 divided by -4 1/6?
the price with tip is $46 and the percent tip is 15% what is the total bill before the tip
what is 1 name for a square besides a quadrilateral and a square?
Can y'all explain 525 divided 25
how can i find the x and y intercepts of a graph equation? (ex. y+ x-4)
Three students collected more than $93 washing cars. They used $15 to reimburse their parents for cleaning supplies. Then they divided the remaining money equa
Why did the articles of impeachment not stand up against President Johnson? A. The issues they addressed were much too vague. B. He resigned before they could t
The pair of points( 6 ,y) and (10, -1) lie on a line with slope 1/4. What is the value of y?