sefykady
sefykady sefykady
  • 16-01-2022
  • Mathematics
contestada

If 6 men finish a piece of work in 8 days, how long will it rake 4 men to​

Respuesta :

prasamsharayamajhi
prasamsharayamajhi prasamsharayamajhi
  • 16-01-2022

Answer:

6 men finish a piece of work in 8 days

1 men finish a piece of work in 8*6 days

4men will finish a piece of work in 48/4

days

..

which is equal to 12 days

Answer Link
aamtally
aamtally aamtally
  • 16-01-2022
6 men working 8days = 48man days
So if 4men were to do same work then=48/4 =12 days
So it takes 12 days
Answer Link

Otras preguntas

Why was FDR's Court Packing Plan a mistake?
a rectangular table top measures 4/9 of a meter long by 4/5 of a meter wide. the area is _____ square meter.
what is a prefix for marine
What is social Darwinism and how was it tied to imperialism?
what is a prefix for marine
information about tigers
WHAT IS 123456567890*1423 THAT MEANS TO DIVIED PLEASE TELL ME THE ANSWER
The width of a computer monitor is 30 cm. If the perimeter is 144 cm, what is the area of the computer monitor?
does anybody know how to write 45/70 in simplest form????
What Is a Zionist? Please help me :)