ANAi3tzenaawe1stor ANAi3tzenaawe1stor
  • 16-01-2017
  • Mathematics
contestada

A construction crew has just built a new road. it took them 7 weeks to build 8.75 kilometers of road. at what rate did they build the road?

Respuesta :

Аноним Аноним
  • 16-01-2017
7 weeks = 8.75

1 week = x

where x is the kilometers of road built in a week

Proportion:

8.75/7 = x/1

7x=8.75

x=1.25
Answer Link

Otras preguntas

Solve for x X^2+6x+9=20
Whats 22x34 to the power of 2.234
A 1 kg ball is hung at the end of a rod 1 m long. If the system balances at a point on the rod one third of the distance from the end holding the mass, what is
Find the weight required to stretch a steel road by 2 mm, if the length of the road is 2 m and diameter 4 mm. Y= 200 GPa and g -9.8 ms2? (a) 356.4 kg (b) 295.4
the public ........ know the facts. a.needs to b. is needing to c. need to​
what is the simplest fprm of x^2+5x-6/x^2+9x+18​
A mass of 0.14 kg is attached to a spring and set into oscillation on a horizontal frictionless surface. The simple harmonic motion of the mass is described by
On the average, how long does an American family remain in poverty?
What is the prime mover in anatomy?
find the distance between the points (-3,2) and (0,3).