ambikathapa2010 ambikathapa2010
  • 12-02-2022
  • Mathematics
contestada

sanaya can do 1/3 part of a work in 1 day and chahanaa can do1/4 part of the same work in 1 day .How much work would they do working together​

Respuesta :

nyajahdonawa811 nyajahdonawa811
  • 12-02-2022

Answer: 36/5= 7.2 days to complete sanaya work day

Step-by-step explanation:

Answer Link

Otras preguntas

I dont get dependent and independent variables if someone can explain it and give an example that wpould be great!​
V=4+30 find the value of v
Describe the relative location of the Sahara desert to two geographic features or regions
Which type of contraction causes a skeletal muscle to shorten?
Suppose that the thickness of sheets of a certain weight of book paper have mean .1 mm and a standard deviation of .003 mm. A particular text- book will be prin
In this stoichiometry problem, determine the theoretical yield: Excess aqueous copper(II) nitrate reacts with aqueous sodium sulfide to produce aqueous sodium
(2+2) x 2 / 1 I am very confused at this questions, dont laugh at me i think this is very hard :( pls help i will give brainlist.
Which algebraic expression is a polynomial? 4x2 – 3x + StartFraction 2 Over x EndFraction –6x3 + x2 – StartRoot 5 EndRoot 8x2 + StartRoot x EndRoot –2x4 + Start
A quality control technican checked a sample of 30 bulbs. Two of the bulbs were defective. If the sample was representative, find the number of bulbs expected t
A patient comes to a rheumatology clinic for pain in her knees due to osteoarthritis. The orthopedic surgeon advises her to undergo knee replacement surgery. Th