andyshhhzzz23453 andyshhhzzz23453
  • 13-02-2022
  • Mathematics
contestada

If 4 electricians can wire some new houses in 20 days, how many electricians would be required to do the job in 10 days?
a. 30
b. 8
c. 45
d. 2

Respuesta :

frozenpods
frozenpods frozenpods
  • 13-02-2022

Answer:

2

Step-by-step explanation:

20/2 = 10

4/2 = 2

Answer Link

Otras preguntas

Why did Lavinia’s face look white and pinched
In two separate drawers, there are 12 pairs of socks, 9 of which are white, and 7 t-shirts, 5 of which are white. If you randomly select one pair of socks from
In two separate drawers, there are 12 pairs of socks, 9 of which are white, and 7 t-shirts, 5 of which are white. If you randomly select one pair of socks from
Where is the list of attribute types? O Diagram O Table O Relationship O Glossary
Which two are functions?
Can you please answer this for me
f(x)=2x-8 g(x)=x^(2) Find a value of x such that fg(x)=0.
Does anyone have a representation of the Pytagorean theorem
Name a line in the image.
What is the pattern 16,11,8.5,7.25,?