jhapriyanshu010
jhapriyanshu010 jhapriyanshu010
  • 15-02-2022
  • Mathematics
contestada

If 24 men complete a work in 10 days , then 12 men can complete the same work in​

Respuesta :

Salvatore5Mikaelson
Salvatore5Mikaelson Salvatore5Mikaelson
  • 15-02-2022
The answer would be 20 days all you have to do is multiply 10 by 2
Answer Link
jenishar58
jenishar58 jenishar58
  • 15-02-2022

Answer:

if 24 men can complete work in 10 days then 12 men ca complete work in 20 days just multiply by 2

Answer Link

Otras preguntas

will tip if your right dm me if you answered
Why does the meeting come to an end in lord of the flies
what would u do with a lobster thrmidor
since the force is decreased by a second class lever, then how is the distance increased?
A bag contains 5 white, 3 black, and 2 green balls. Balls are picked at random. Explain why the events picking a black ball and then another black ball without
Qui est Basile dans le roman de romain puertolas sous le parapluie d'Adélaïde
What is the impact of the exclusionary rule on police practice in criminal investigations?
The great gatsby lesson 5 handout 8 cast the stars
Which piece of evidence best supports a written argument encouraging students to eat less candy
Which appeal does the following statement use? "Mom, did you know that the single biggest predictor of high academic achievement and high ACT scores is reading