mparrish2965 mparrish2965
  • 03-07-2022
  • Engineering
contestada

A feature control frame must be connected to

Respuesta :

tcs1257621
tcs1257621 tcs1257621
  • 03-07-2022

Answer:

Surface Parallelism When a surface is to be parallel to a datum plane, the feature control frame is connected by a leader to the surface, or to an extension line from the surface.

Explanation:

Answer Link

Otras preguntas

Describe how organisms depend on other members of an ecosystem to live and grow.
What can moving electric charge produce? In what direction is it generated?
Label the four layers of Earth's geosphere. Then write the word solid next to the two layers that are completely rigid.​
did i do this correctly? if i didnt what did i do wrong?
What is the purpose of a pamphlet to inform and persuade the reader
Pls Help Round the numbers in each expression to the nearest whole number. Then select all expressions that are about 8. A. 3 1 5 + 5 7 9 B. 15 5 7 − 8 2 9
give the meaning of the following phrasal verbs:put off,look down on, take after,go after, ask after, stand out,call out, hand over, map out, pass by​
 police officer : enforce :: A father : teach B television : inform C judge : uphold D politician : destroy
There were 25 runners competing in a race. The number of runners who finished ahead of Paula was one-third the number of runners who finished after her. In what
The total current of a parallel circuit is 9+j2 amps and the current of one component of the circuit is 3−j5 amps. What is the current of the other component of