henriquefvboas68241 henriquefvboas68241
  • 01-08-2022
  • Business
contestada

In general, the production manager is responsible for the materials price variance. True or false?.

Respuesta :

PallasAthena23
PallasAthena23 PallasAthena23
  • 01-08-2022
False

In general, materials price variance is the responsibility of the purchasing manager, not the production manager.
Answer Link

Otras preguntas

Whose election to the presidency marked a beginning of the reduction of Cherokee rights?
simplify : 7 root 3 / root 10 + root 3 - 2 root 5 / root 6 + root 5 - 3 root 2 / root 15 + 3 root 2
graph y-3=1^2(x+2) on a sheet of paper please
The days are getting shorter and the temperature is dropping. The squirrel responds to these cues by
How to find x and giving reason?
What is the value of the 6 in 4.768
There are several different assays to detect the products of digestive enzymes (hydrolases). since chemical changes cannot be seen with the naked eye, these ass
How is the end product of mitosis like the end product of binary fission
Read the following excerpt from the article "Vision, Voice and the Power of Creation: An Author Speaks Out," by T. A. Barron, and answer the question that follo
what is the answer to m2=91