alyssaaaaaa1 alyssaaaaaa1
  • 02-05-2017
  • Mathematics
contestada

it takes three days for a construction company to prepare a model of a building for their client . how many full models can they prepare in 86 days

Respuesta :

Nadia2004
Nadia2004 Nadia2004
  • 02-05-2017
they would create 28 full models
Answer Link
Bea1111 Bea1111
  • 02-05-2017
You divide 86 by 3 to get the answer.
Answer Link

Otras preguntas

Need help asap Will mark you brainlist
Shana wants to use all 62 feet of the fencing she has to make a rectangular run for her dog. She decides to make the length of the run 20 feet. She writes and s
A salmon jumps up a waterfall 2.4 m high. With what minimum speed did the salmon leave the water below to reach the top?
can someone pls help with this i’m so confused
Please can i get help
4 and 3/5 divided by 2 and 1/2 ​
To save on heating bills, do you think the roof of a building should be lined with1. a thermal conductor2. a thermal insulator3. nothing
1 1 8 x 1,000) + (3 x 100) + (2 x 1) + (4 x 10) + (7 X 1000
How does the quote "We are already so far,so high!What? Are we really leaving these people down there?"contribute to the story?
Which statement describes Ayatollah Khomeini? He served as the last shah of Iran. He became the first democratic president of Iran. He helped found the Muslim B