ridume2020 ridume2020
  • 02-01-2024
  • Mathematics
contestada

Montu finishes a piece of work in 24 days. How much work will he complete in 8 days?​

Respuesta :

ahmedmaham984
ahmedmaham984 ahmedmaham984
  • 02-01-2024

Answer:

Therefore, he will complete 1/3 of the work in 8 days as 24 ÷ 8 = 3.

Answer Link

Otras preguntas

How "democratic" was the united states during the 1830s? who was included in the political process and who was not?
How many insects are there from 2017
Which sentence uses the most precise language? With so many steps in the instructions, we didn't know what to do next. With multiple steps in the instruction
what way does the Earth's atmosphere interact with the geosphere
How does Anglo-Saxon sense of home compare to ours?
Use the following passage to answer the question. (1) Water is something most of us take for granted. (2) If we need a cold drink or want to take a shower, wat
Who employed the most slave traders and sellers
The case of Furman v. Georgia (1972) resulted in a reinterpretation of the meaning of
Both the average flow rate and average flow time of a process are increased by 50%. what will be the percentage change
A wildlife biologist is interested in the relationship between the number of chirps per minute for crickets (y) and temperature. based on the collected data, th