duncanreleford
duncanreleford duncanreleford
  • 12-03-2018
  • Physics
contestada

determine the quantity of work done when a crane lifts a 100-n and block from 2 m above the ground to a 6 m above the ground

determine the quantity of work done when a crane lifts a 100n and block from 2 m above the ground to a 6 m above the ground class=

Respuesta :

lidaralbany lidaralbany
  • 07-02-2019

Answer: 400 J

Explanation :

Given that,

Force = 100 N

Distance  = 6 m - 2 m = 4 m

Now , the work done is equal to the multiplication of the force and distance.

W = F * d

[tex]W = 100\ N\times 4\ m[/tex]

[tex]W = 400 J[/tex]

Hence, the quantity of work done is 400 J

Answer Link

Otras preguntas

Evaluate 3x-12 for x=5
PLS HELP ILL MARK BRAINLIEST TechWiz Electronics makes a profit of $35 or each MP3 player sold and $18 for each DVD player sold. Last week, TechWiz sold combine
i need these 3 as soon as possible I don't know if its right
Can you guess this place? In Arizona.
The perceived value of a hand-made piece of decorative art is based on all of the following EXCEPT:
During the early days of the supercontinent of Pangea biodiversity was low; the landscape was covered with ferns and pines. What evolutionary advantage did the
Read the lines from “The Village Blacksmith.” You can hear his bellows blow; You can hear him swing his heavy sledge, With measured beat and slow, How does the
Which is the quotient of 43 . 5 ÷ 3 ? A. 0.45 B. 1.45 C. 1.5 D. 14.5
Prove that the cumulative distribution function of the maximum of a pair of values drawn from random variable X is the square of the original cumulative distrib
Why is learning about Art Vocabulary important? Question 1 options: Art Vocabulary can be used to describe ANY artwork – such as ancient art, modern art, and ev