Tyannah9466 Tyannah9466
  • 04-04-2018
  • Business
contestada

The easiest and cheapest time to alter the information system is in theâ ________ phase.

a. system definition

b. implementation

c. requirements analysis

d. component design

e. system maintenance

Respuesta :

fireflies854 fireflies854
  • 04-04-2018
d or c hope this helps

Answer Link

Otras preguntas

Add and simplify: 9/16 + 1/2=?*
if a triangle has a height of 12 inches in the base of 5 inches what is the area
There are approximately 7.5x10^18 grains of sand on earth.There are approximately 7x10 ^27 atoms in an average human body.Are there more grains of sand on earth
what major city is the farthest south in south america
The entire percussion section with the high school band.march;marches;play;or playing
Show how to multiply 6 x 298 using properties and mental math
Which shows a way to find 15×32
What are three different factorizations of the number 16. Do not is 1 as a factor
Why were Japanese Americans in Hawaii not forced to go to internment camps?
What is 0.1 times 30