revillaengelbep76mcy revillaengelbep76mcy
  • 14-04-2018
  • Mathematics
contestada

sí 8 trabajadores tardan 5 días en hacer una obra, cuánto tardarán si son 16 trabajadores, Y si son 4 trabajadores. proporcionalidad

Respuesta :

amendocrr amendocrr
  • 14-04-2018
si son 16 trabajadores serian 10 días porque 8 es la mitad de 16 y si fueran 4 trabajadores seria 2.5 días 

Answer Link

Otras preguntas

What's the answer to 1 and 2?
The statements "I wish you would be friendlier," "You are such a slob," and "You need to have a more positive attitude" are examples of ________.
Estimate the square root of 450 to the nearest hundreths place
Lee made 4 gal of soup did she make more than or less than 70 c of soup
Which civilizations ideas were the foundation or collective learning in the mediterranean world
Find y when x=6 and z=8 if y varies jointly as x and z and y=60 when x=3 and z=4 A. Y=6×6×10; 360 B. Y=5×6×8; 240 C. Y=5×6×10; 300 D. Y=5×5×8; 200
find the slope between the following points
Problem 18 is the question. I need to know the answer.
Identify the function of the phrase contained in the following sentence. Her main concern was wearing a diamond necklace. subject direct object predicate
Read the passage from " A Red, Red Rose" by Robert Burns. " Til a' the seas gang dry, my dear, And the rocks melt wi'the sun; I will luve thee still, my dear, W