lovelybear9966 lovelybear9966
  • 03-05-2018
  • Mathematics
contestada

Bart can paint one house in 3 hours. ann can paint one house in 5 hours. how long would it take bart & ann to paint one house if they worked together?

Respuesta :

DilaraDemirbag DilaraDemirbag
  • 03-05-2018
It will take them 4 hours
Answer Link

Otras preguntas

A valuable asset pledged to a lender as security for a loan is called: A.net worth. B.collateral. C.wealth. D.capital.
What are some independent variables that are in some way related to global warming?
Write the square of the binomial as a polynomial: (−1 1/3 p+6q)^2
What is subject questions?
Travelling 900 km by rail costs Rs. 280. What would be the fare journey of 360 km when a person travels by the same class?
10 men who work 9hours per day, complete half of a work in 6days. How many days required for 15 men who work 12 hour per day to complete the rest of the work ​
6. A metal forms two oxides, A and B. 1 g of A on reduction gave 0.881 g ofmetal, while 1 g of B yielded 0.788 g of metal. Show that these facts are inagreement
Which could be a pathway of food through an ecosystem? O autotroph - heterotroph – heterotroph autotroph - autotroph – heterotroph heterotroph - autotroph - aut
How many shells containing electrons does a potassium atom have?
The radius of the earth is 6380 km and the height of mt.everest is 8848 m. if the value of of acceleration due to gravity on the top of mt.everest is 9.77m\s ,